Supporting documents - October 2026 consultation

Traffic Resolution (TR75-26)

Traffic Resolution (TR) document for deferred Hataitai bus stops on the Eastern Bus Corridor

TR75 26 Eastern Bus Corridor Moxham Ave updated Improvements 10 SEP 2026 signed (489 KB pdf)

Traffic Resolution (TR81-26)

Traffic Resolution (TR) document for deferred Kilbirnie bus stop on the Eastern Bus Corridor

TR81 26 Eastern Bus Corridor Rongotai Rd updated Improvements 2 OCT 2026 signed (559 KB pdf)

Traffic Resolution (TR82-26)

Traffic Resolution (TR) document for deferred Miramar bus stops on the Eastern Bus Corridor

TR82 26 Eastern Bus Corridor Park Rd updated Improvements 2 OCT 2026 signed (542 KB pdf)

Traffic Resolution drawing set (TR75-26)

Traffic Resolution (TR) drawings for deferred Hataitai bus stops on the Eastern Bus Corridor

1097521.0000 ROUTE 2 TRAFFIC RESOLUTION SET HATAITAI REVISION Revision 7 (13 MB pdf)

Traffic Resolution drawing set (TR81-26 and TR82-26)

Traffic Resolution (TR) drawings for deferred Kilbirnie and Miramar bus stops on the Eastern Bus Corridor

1097521.0000 ROUTE 2 TRAFFIC RESOLUTION SET RONGOTAI AND PARK RD REVISION (14 MB pdf)

Updated overview maps for Eastern Bus Corridor changes

Updated maps outlining the alternative proposed changes along the Eastern Bus Corridor. Includes a map showing changes across the whole corridor, as well as changes proposed for each suburb (Hataitai, Kilbirnie and Miramar)

Alternative proposal maps Overview, Hataitai, Kilbirnie, Miramar (16 MB pdf)

October 2026 consultation survey

Downloadable PDF of the consultation survey, including pre-paid WCC postal address

20261008 EBC2 survey paper form (800 KB pdf)

Supporting documents - June 2026 consultation

June 2026 consultation summary

Bus improvements feedback: consultation summary document

Bus improvements feedback Eastern Bus Corridor ConsultationSummaryReport July2026 (1.6 MB pdf)

Traffic resolution

Traffic Resolution (TR) document for the Eastern Bus Corridor project

TR58 26 Eastern Bus Corridor Improvements FINAL 7 MAY 2026 (725 KB pdf)

Eastern Bus Corridor designs

Detailed designs for the road marking and bus stop changes along the Eastern Bus Corridor between Miramar and the central city

1097521.0000 ROUTE 2 TRAFFIC RESOLUTION SET Revision 6 (35 MB pdf)

Eastern Bus Corridor business case (draft)

Draft business case for the Eastern Bus Corridor project

DRAFT Eastern Bus Corridor Improvements Business Case for consultation May 2026 (1.5 MB pdf)

Overview maps for Eastern Bus Corridor changes

Maps outlining the changes along the Eastern Bus Corridor from Miramar to the Central City. Includes a map showing changes across the whole corridor, as well as changes proposed for each suburb (Mt Victoria, Hataitai, Kilbirnie and Miramar)

Eastern Bus Corridor Improvements Overview Maps v6 WCC (2.1 MB pdf)

Safe systems audit

Safe Systems Audit for the Eastern Bus Corridor project

EBC SSA 06 OCT 25 Signed (2.3 MB pdf)

Bus patronage numbers

Bus patronage numbers by bus stop and location for stops along the Eastern Bus Corridor

Bus Patronage Numbers by Bus Stop and Location (38 KB pdf)