Supporting documents - consultation 2026
Bunny Street plans
This document contains detailed design drawings of the proposed Bunny Street changes
Traffic Resolution TR26-30 (PDF version)
TR 30 26 Bunny Street Connection July 2026 (1 MB pdf)Traffic Resolution TR26-30 (Word version)
TR 30 26 Bunny Street Connection July 2026 (3.3 MB docx)Safe systems audit (PDF version)
The safe systems audit is an independent review of the proposed design.
Safe systems audit (word version)
The safe systems audit is an independent review of the proposed design.
Accessibility audit (PDF version)
The accessibility audit is an independent accessibility review of the proposed design.
Accessibility audit (word version)
The accessibility audit is an independent accessibility review of the proposed design.
Options considered (PDF version)
This document outlines different options considered by the project team.
Options considered (word version)
This document outlines different options considered by the project team.